AWSHow-To & HardeningRetrospectives

Multi-Region Disaster Recovery Test Checklist

By OnCloudSec Research Team · Published Oct 6, 2026 · 1 min read

Retrospective: this article looks back at events from December 2021, written in 2026 with the benefit of hindsight.

Use this checklist to plan and run a multi-region disaster recovery test for an AWS workload.

Before the test

  • Workload owner, RTO and RPO targets documented.
  • DR strategy chosen (backup/restore, pilot light, warm standby, active-active).
  • Data replication status verified (replication lag, last successful backup copy).
  • Infrastructure as code for the secondary region is current.
  • KMS keys, secrets and parameters exist in the secondary region.
  • DNS failover mechanism documented and tested in a non-production domain.
  • Test scope, success criteria and rollback plan agreed.
  • Stakeholders and customers informed if user-facing impact is possible.

During the test

  • Start time recorded.
  • Failover triggered using the documented procedure, by someone other than its author.
  • Application health checks pass in the secondary region.
  • Data integrity verified (recent transactions present).
  • Time to restore service recorded.
  • Monitoring and alerting work in the secondary region.
  • Support and communication steps exercised.

Failback

  • Failback procedure executed and timed.
  • Data changes made during failover reconciled.

After the test

  • Actual RTO and RPO compared with targets.
  • Gaps documented with owners and dates.
  • Runbook updated.
  • Results reported to leadership.

Frequency

  • Critical workloads: at least annually; after major architecture changes.
multi-region disaster recovery test checklistAWS us-east-1 outage 20212021

More on this story